The Moody Center will be the University of Texas’ new arena for hosting athletic and concert events.
CHALLENGE: Bosworth Steel reached out to us needing to urgently connect several media platforms throughout the facility and preferred to avoid welding.
SOLUTION: LNA Solutions proposed using type BK BeamClamp® Assemblies for this project, which Bosworth agreed upon. This was a quick turnaround project and the design and components were needed overnight. LNA was able to provide the parts and drawings within a 24 hour period.