Moody Center Arena, UT, Austin, TX

The Moody Center will be the University of Texas’ new arena for hosting athletic and concert events.

CHALLENGE: Bosworth Steel reached out to us needing to urgently connect several media platforms throughout the facility and preferred to avoid welding.

SOLUTION: LNA Solutions proposed using type BK BeamClamp® Assemblies for this project, which Bosworth agreed upon. This was a quick turnaround project and the design and components were needed overnight. LNA was able to provide the parts and drawings within a 24 hour period.

beamclamp type bk flange clamp

Flat and Sloped (Type BK)

  • Hot Dip Galvanized BS EN ISO 1461
  • Manufactured from Ductile Iron to BS EN 1563
  • 5 to 1 Factor of Safety
  • Lloyds Register approved
  • Self adjusting body style
See Product Page

Execution

BeamClamp® Application Methods
See All BeamClamp® Applications