• Products
  • Applications
  • Case Studies
  • Resources
    • Resources Overview
    • Downloads
      • 2D CAD Drawings
      • 3D CAD Drawings
      • Catalogs
    • Videos
  • About
  • Contact
  • Find A Rep
  • Lunch and Learn
  • 1 (888) 724-2323
  • Get A Quote
  • Find A Rep
  • Lunch & Learn
LNA Solutions
  • Products
  • Applications
  • Case Studies
  • Resources
    • Downloads
      • 2D CAD Drawings
      • 3D CAD Drawings
      • Catalogs
    • Videos
    • Product FAQ
    • Specifying BeamClamp®
    • Product Material Specification
  • About
  • Contact
1 (888) 724-2323
LNA Solutions
steel projects for building services
Home Case Studies

Case Studies

We take pride in our work. Take a look at how our products, including BeamClamp® and BoxBolt® products, have been used in a variety of specific applications across a broad spectrum of industries.

Walmart Distribution Center

Walmart Distribution Center, Colton, CA

LNA was tasked by Walmart to provide a solution to build, design, connect and support conveyor belts in their new distribution Center in Colton, CA.

View Case Study

Reston station – Curtain Wall Glazing

LNA partnered with Thornton Tomasetti on Reston metro station, an eye-catching Transit-Oriented, Mixed-Use development outside Washington D.C.,

View Case Study

Daytona International Speedway Upgrade

Daytona international Speedway underwent a complete signage upgrade prior to the 2016 NASCAR Daytona 500.

View Case Study

Tyco International Covered Garden Walkway

LNA supplied our ICC Approved Type C BoxBolts to connect the steel tube framing for the roof joists and walls.

View Case Study

Children’s Mercy Park | Sporting Kansas City

Once again partnering with longtime client Thornton Tomasetti, LNA assisted in the design and contruction of the the Mazuma Mezzanine, which is the first major expansion project at Children’s Mercy Park in Kansas City.

View Case Study

Sacramento Courthouse

LNA partnered with ACCO Engineered Systems to design a BeamClamp solution to support multiple steel-span trolley systems in order to transport HVAC equipment.

View Case Study

Meijer Store Front

Meijer stores began in 1934 with the opening of its first grocery store in Greenville, Michigan. It has since grown into over 200 stores in six states.

View Case Study

Hunters Point South Pavilion

Hunter’s Point South Waterfront Park transforms 30 acres of post-industrial waterfront into a rich public space in Queens, NY.

View Case Study

Hospital Roof additional HVAC

Hedrick Air was tasked with designing and installing a roofcurb for an air HVAC unit on the roof of a hospital. Using BK Type BeamClamps, they did not have to drill, cut, or weld on the roof.

View Case Study
Schaefer Systems International

Schaefer Systems International

Schaefer Systems International is the largest logistic system manufacturer in the US. They specialize in designing and building material handling and warehouse storage systems.

View Case Study

General Dynamics NASSCO

NASSCO reached out to LNA to securely fasten steel plates of diamond tread flooring to ship decks while still allowing them to be easily removed when necessary.

View Case Study

Mecart, Greenville, South Carolina

A clean manufacturing facility that did not allow drilling or welding asked LNA to update their railing system.

View Case Study
BeamClamp Solutions - LNA Solutions

Billie Jean King National Tennis Center, Queens, NY

The Billie Jean King National Tennis Center approached LNA about creating an enclosure on an existing structure.

View Case Study
LaGuardia Airport

LaGuardia Airport Delta Expansion

LaGuardia Airport had to connect steel components for a curtain wall installation without the use of welding due to the airport staying open.

View Case Study
Beam Clamp Assemblies at Los Angeles Stadium - LNA Solutions

LA Stadium (SoFi) Videoboard

LNA Solutions used BeamClamp assemblies to hang a circular video board at The Los Angeles Stadium & Entertainment District.

View Case Study

LA Stadium (SoFi) Roof Signage

After the successful installation of the overhead screens, LNA was asked to design a system to attach to the outer signage to the roof of the stadium.

View Case Study
Blockable With Type C BoxBolt

Blokable Inc., Vancouver, WA

LNA Solutions worked with Blokable to connect hollow steel beams for modular homes in a high seismic zone.

View Case Study

Civil Construction BeamClamp Bridge Job

LNA Solutions worked with Terry Construction to install a new walkway with reinforcement for the Qualls Prather Bridge. 

View Case Study

Moody Center Arena, UT, Austin, TX

The Moody Center will be the University of Texas’ new arena for hosting athletic and concert events.

View Case Study

One World Trade Center

One World Trade Center is the largest of a series of buildings in the area that is known as Ground Zero. This 16 acre site includes the National 9/11 Memorial.

View Case Study

FedEx Distribution Center

LNA worked with Western Industrial Contractors to create a design using BeamClamp that is both more structurally effective and cost efficient while providing superior service.

View Case Study

Blue Origin Rocket Launch Pad,Cape Canaveral, FL

Blue Origin is a space company focused on perfecting reusable space travel vehicles to expand humanity to the final frontier.

View Case Study

Lehman College, Bronx, NY

Lehman College and the Engineers at SGH Consulting looked to LNA Solutions to design a Custom BeamClamp Assembly

View Case Study
BART.System.Case.Study

San Francisco Bay Area

Rapid Transit BART Monorail Upgrades

View Case Study
PWTP Baltimore MD

Patapsco Water Treatment Plant, Baltimore, MD

Following a fatality, Patapsco Water Treatment Plant partners with LNA Solutions to replace their grating clips with LNA's Stainless Steel GF1S08.

View Case Study

Mercedes-Benz Stadium, Atlanta, Georgia

Retractable oculus roof

View Case Study

Tunnel Reinforcement

Tunnel in Newport News, Virgina

View Case Study

Strengthening Sea Wall

Sea Wall in Duluth, MN

View Case Study

University of Buffalo

Solar Array

View Case Study

New York Public School 59

Rooftop playground

View Case Study

Conrad Hotel in Battery Park

Rooftop garden

View Case Study

Exelon Eddystone Generating Station

Monorail system running the length of the building

View Case Study
Temporary construction pulley view 2

Temporary Construction Pulley Track

Pulley Track for Temporary Construction Pulley

View Case Study
  • Products
    • BeamClamp
    • BoxBolt
    • Steel Floor Fasteners
    • Pre-Engineered Solutions
  • Applications
  • Case Studies
  • Resources
  • About
  • Contact
1 (888) 724-2323
[email protected] 100 Stradtman St., Buffalo, NY 14206

©2023 LNA Solutions | Privacy Policy
Site Created by Renoun Creative